Vibration Guard

Continuously monitors bearing vibration across all rotating equipment and predicts failures.

RunningMaintenanceEdge runtimeOwned by Sam Rivera
← All runs

r-4815

Pending approval

Drafted work order for P-12 bearing replacement

Timeline

  1. 02:14:08
    Anomaly detected on P-12
    Vibration 4.6 mm/s (threshold 4.5)
  2. 02:14:30
    Pulled 72h trend
    query_tagsLinear rise 2.1 → 4.6 mm/s
  3. 02:15:12
    Spectral analysis
    Inner-race bearing wear signature
  4. 02:16:04
    Failure projection
    4–6 days to critical threshold
  5. 02:16:48
    Looked up bearing part
    knowledge_searchSKF-6205-2RS from manual
  6. 02:17:24
    Checked stock
    call_inventory_api14 units on hand
  7. 02:18:06
    Found maintenance window
    query_scheduleThu 02:00–04:00 available
  8. 02:19:42
    Drafted work order
    WO-4521 created in CMMS draft state
  9. 02:21:18
    Submitted for approval
    Pending Sam Rivera