Alerts
Notifications, escalations, and routing rules for everything your agents emit. This is the asynchronous twin of approvals — facts you should know about, not decisions waiting on you.
| Severity | Title | Agent | Fired | Status | Responder |
|---|---|---|---|---|---|
| Critical | P-12 bearing exceeded vibration threshold 4.6 mm/s sustained over 5 minutes (ISO 10816 alert at 4.5 mm/s) | Vibration Guard | 4h ago | Resolved | Marcus Liu |
| Warning | Line 3 label adhesion defect rate spike Defect rate jumped from 0.4% to 2.1% over 30 minutes | Quality Investigator | 3h ago | Acknowledged | Priya Shah |
| Warning | Capper 2 torque drift below lower control limit Torque setpoint drifted from 14.2 N·m to 13.6 N·m | Capper Torque Monitor | 3h ago | Resolved | Auto-corrected |
| Info | Chiller 1 setpoint reduced by 0.5°C Estimated savings: 184 kWh/day | Energy Optimizer | 7h ago | Sent | — |
| Info | Compressor staging recommendation Stage 2 compressor idle 14% of shift; consider single-stage operation overnight | Energy Optimizer | 11h ago | Sent | — |
| Warning | edge-northfield-03 replication lag exceeded 60s WAN outage at 02:14 caused replication backlog. Currently catching up. | System | 4h ago | Resolved | Auto-resolved at 06:42 |
| Critical | P-08 bearing replacement complete Vibration returned to baseline at 1.8 mm/s | Vibration Guard | Feb 11 | Resolved | Marcus Liu |