Shift Handoff

Morning shift · Tue Apr 12 · 05:55–14:00

Current shift summary

Lines 1, 2, 4 running steady at 91% OEE avg. Line 3 showing adhesive drift — Quality Investigator flagged batch B-2026-042 at 03:41 and drafted a revert to B-2026-041 pending Priya's approval. P-12 CIP return pump bearing replacement work order is drafted and scheduled for Thursday 02:00 window.

Open downtime events

  • Line 3 · 14m · label adhesive
  • Line 2 · 4m · capper drift (resolved)

Quality events

  • Line 3 label adhesion · 2.1% (target 0.5%)
  • Line 2 capper torque · within band

Handoff checklist

  • Review overnight downtime events
  • Confirm CIP cycle on Line 1 passed spec
  • Approve P-12 bearing work order
  • Acknowledge Line 3 adhesive alert